Construction is underway on Whitehaven.
Feb 9, 2017
1 min read
20170209_095724_resized 20170209_095711_resized 20170209_095606_resized 20170209_095501_resized 20170209_095522_resized 20170209_095703_resized
Whitehaven Apartments - Ground Floor Slab
Construction is well under way now, even after the rain event we have just had and the Christmas/New Year break. Footings are in, under slab plumbing, drainage and electrical have all gone in and the ground floor slab has been poured.